Slate-hung dormer cheek with lead valley and black fascia on a new slate roof

Period house re-slate with slate-hung dormer cheeks

Steep period roof re-slated, with slate-hung dormer cheeks, lead valleys and new black fascias.

  • Steep period roof with gables
  • Slate-hung dormer cheeks
  • Lead valleys and new fascias

Photos from the job

A steep period house with gables and a dormer was fully re-slated. The dormer cheeks were hung with slate to match the roof, lead valleys were formed at every junction, and new black fascias and bargeboards finished the edges.

Steep roofs need proper access

Period houses often have steep pitches, tall gables and several roof levels. Safe, full scaffold is not optional on a roof like this. It also gives somewhere to load out slates so the roofers are not carrying them up ladders all day.

The scaffold photo shows slates stacked ready on the lift beside the gable, with the old roof being stripped above.

Matching the dormer to the roof

Hanging the dormer cheeks in slate makes the dormer look part of the roof rather than an add-on. Each cheek meets the main roof at a valley, which was formed in lead with the slates cut in on both sides.

New black fascias and bargeboards were fitted to finish the edges and keep a period look.

Tell us what the roof is doing

We come and look, take photos, and give you a fixed written price. No charge, and no pressure to book.

Get a free quote
Email usFree quote

Get a free quote

Describe what the roof is doing and we will come back with a ballpark, then arrange a survey before quoting. Or emailinfo@barryroofers.co.uk.

We use your details only to reply about your roof. No marketing, no passing them on.